CARBOTURA
Advanced Circular Manufacturing · Circular Supply Agreement · CSA + Exogenesis™

State of Maharashtra

Maharashtra, India · Government of Maharashtra · CSA + Exogenesis™ · Document Hubमहाराष्ट्र, भारत · महाराष्ट्र सरकार · CSA + एक्सोजेनेसिस™ · दस्तऐवज केंद्र

B2G · State Authority
30-Year BOO · IFRS
400 / 1,000 / 2,000 TPD
CSA + Exogenesis™
Beneficiation Fee + Circular Royalty™ · Exogenesis™ $25/ton

Engagement Path — Follow the Numbers

1 LOI / MOU engagement begins A non-binding Letter of Intent / Memorandum of Understanding. It opens the engagement, establishes the joint working group and data exchange, and carries no cost and no obligation for the community. Steps 1–5 are paper — typically 3–18 months in total.
2 Term Sheet verification & terms The verification phase. Feedstock streams, volumes, and the community’s disposal-cost basis (FWDC) are confirmed, the site is selected, and the per-tonne commercial terms are agreed before anything is signed long-term.
3 CSA execution = T0 The Circular Supply Agreement — a minimum 30-year supply contract with perpetual continuation. Execution starts the project clock (T0). It locks the Beneficiation Fee, the Circular Royalty™, the feedstock commitment, and site access.
4 Underwriting Carbotura-financed Carbotura arranges 100% of the facility financing under its Build-Own-Operate model. The community contributes zero capital and takes no construction or financing risk; an 18-month Parent Performance Guarantee backs all payment obligations.
5 Permitting manufacturing basis The facility is permitted as manufacturing (NAICS 31–33), never as waste processing. Both parties commit to the Regulatory Predicate Transition — the endpoint is categorical: manufacturing classification across all permitting, licensing and regulatory contexts.
6 Deployment build · 12–18 months The facility is manufactured and deployed in standardized 100 TPD modular increments rather than built as one-off construction — a 12–18 month build from CSA execution to commissioning.
7 COD & Royalties royalty +13mo after first fee Commercial Operations Date: the facility begins accepting feedstock. The Beneficiation Fee applies to delivered tonnage, and the first Circular Royalty™ payment follows 13 months after the first fee payment, then monthly, escalating every year.

Download the Engagement Path one-pager (PDF)

State of Maharashtra · Advanced Circular Manufacturing Overview
2,000
TPD · Phase 3 Maximum
730,000 t/yr · phased 400 → 1,000 → 2,000 TPD
$106.03M
Year 2 Combined Royalty
Circular Royalty™ + Exogenesis™ · 2,000 TPD · Year 2
$4.78B
30-Year Royalty Total
Combined Circular Royalty™ + Exogenesis™ · 2,000 TPD · undiscounted
₹0
State Capital Commitment
Zero public capex · all phases · BOO structure
Package Hub · Discovery Phase · DOC 01 OF 06

What this document is

The entry point for the Maharashtra state-level Circular Supply Agreement engagement. This hub indexes all six package documents, presents key engagement metrics, and routes decision-makers and technical reviewers to the appropriate document.

Three things this document says
  1. Carbotura offers a single commercial structure: the Circular Supply Agreement (CSA) — Beneficiation Fee (TMC Fee) + Circular Royalty™, with the Exogenesis™ Royalty ($25/ton) stacking alongside it.
  2. The phased deployment (400 → 1,000 → 2,000 TPD) delivers a combined 30-year royalty income of $956M, $2.39B, or $4.78B depending on phase reached.
  3. Zero state capital commitment at any phase — Carbotura finances, builds, owns, and operates under a 30-year BOO structure.
Looking for something else?
Document Package · June 2026
Executive Decision Brief
One Action · One Deadline
Single-page action brief for elected officials and state finance. Fiscal position by period, Circular Royalty™ + Exogenesis™ Royalty summary, cost of delay, and LOI/MOU execution pathway. Print-optimised.
CSA + Exogenesis™ Print-optimised Emerald · DOC 02
Open document ↗
Feedstock & Infrastructure Study
Maharashtra Feedstock Profile & System Baseline
State-level manufacturing feedstock flows, disposal infrastructure, legacy deposit inventory, regulatory baseline, and phased addressable opportunity. Diagnosis only — no commercial terms.
400 / 1,000 / 2,000 TPD Exogenesis™ sites Mustard · DOC 03
Open document ↗
Circular Supply Agreement Proposal
30-Year BOO Proposal · CSA + Exogenesis™
CSA commercial structure, Beneficiation Fee (TMC Fee), Circular Royalty™ mechanics, Exogenesis™ Royalty terms, site candidate analysis, and counterparty guarantee requirements.
Beneficiation Fee $100/ton Exogenesis™ $25/ton Blue · DOC 04
Open document ↗
Economic Impact Report
State A vs. State B · Delta Model
Quantified fiscal, environmental, and structural delta between current system and CSA deployment. 30-year Circular Royalty™ + Exogenesis™ Royalty tables across all three phases, sensitivity analysis, and decision window.
3 capacity scenarios 30-yr projections Blue · DOC 05
Open document ↗
Community Benefits Summary
What Maharashtra Receives
Plain-language summary of direct state benefits: Circular Royalty™ income, Exogenesis™ Royalty, employment, environmental improvement, and BOO risk transfer.
Public-facing Plain language Emerald · DOC 06
Open document ↗
Advanced Circular Manufacturing — manufacturing from every material, everywhere.
Carbotura converts manufacturing feedstock into high-value manufactured materials through Total Material Conversion. Zero public capital required. Revenue flows back to the state 13 months after corresponding Beneficiation Fee payment.
Contact
carbotura.com/contact
Programme Overview · General Audience

What Adopting Carbotura Changes →↗

Programme-level explainer: the CSA plus the Exogenesis™ Royalty add-on, fiscal timeline, State A vs State B delta, and the Regulatory Predicate Transition — the dewaste pathway off waste-domain law onto manufacturing law. Applies to every community.

Learn about the programme →↗